Senior Design Project

During their senior semester, MEM students are given the opportunity to apply what they have learned in a project sponsored by a local company. Students regularly visit the company to update managers and discuss project issues. At the end of the term, students formally demonstrate their project in an oral presentation to the company and a written report to the faculty.

Sample Projects:


  TITLE    COMPANY    YEAR    GOAL
Improving Repair Process of Helicopter Bladesn Sikorsky 2002 Design a new method to remove cover from helicopter blades in order ro reduce risk of injuries
Burr removal Pratt & Whitney 2003 Improve current deburring process at manufacturing cell
CBN grinding optimization Pratt & Whitney 2003 Minimize burrs
Electric circuit system for grinding machine Pratt & Whitney 2003 Design a less expensive control system for a grindng machine
Turbine Blade and Vane Production Optimization Pratt & Whitney 2003 Create a scheduling algorithm to find an optimum production schedule
Production Flow Line Simulation MTU Aero Engines 2004 Identify bottlenecks, improve process
Outsourcing and New Technology in Reprographic Production on Mylar Sikorsky 2005 Investigate options to change Mylar process: outsourcing, improving plotting machines, and implementation of new technologies
Inventory Reduction GE 2006 Reduce inventory of powerbreak by 20%
Alternative Technology to Mylar Operation Sikorsky 2006 Find an alternative method for part inspection to replace the current Mylar system
Mylar Alternatives Implemented by Other Companies Sikorsky 2006 Investigate several companies and their suppliers to see alternative methods of inspection to Mylar
Outsourcing Alternatives for Mylar Production Sikorsky 2006 Find possible vendors that can house the Mylar process
DELMIA Quest Modeling CCAT 2007 Analyze the potential of simulation program Quest in building computer models for manufacturing processes
Large Frame Power Break II Lean Project GE 2007 Increase capacity of Power Break II circuit breakers to meet unsatisfied demand
Jet Water Stripping Pratt & Whitney 2007 Investigate a new method for removal of chemical coatings
Process Automation Pratt & Whitney 2007 Improve proposal process, automate an existing business function currently being performed manually
S76-D Weight Optimization Sikorsky 2007 Minimize weight of an aircraft without sacrificing performance, comfort, or ease of manufacturing
Sikorsky Offsite Communications Sikorsky 2007 Find possible solutions to improve communications between Sikorsky and offsite vendors
Core Competencies Trumpf Inc. 2007 Study two or three groups of production components and collect information such as capacity requirements and purchasing volume
Mounting of a Coaxial Laser Trumpf Inc. 2007 Modify current process to attach a 500kg laser to a punch press machine while the punch press machine is being assembled
Arena Simulation CCAT 2008 Use simulation program Arena to model a manufacturing process of an aerospace company
Generator Testing DRS 2008 Improve and maximize capacity within the generator testing department
Enhancing Engineering Capability Sikorsky 2008 Improve process for hiring new employees taking into account their location, experience, and learning curve characteristics
Heavy Machinery Transportation Trumpf Inc. 2008 Develop a more advanced transportation and leveling system for its TruLaser Series
Plexiglas Cube Storage Improvements Trumpf Inc. 2008 Create a solution that is inexpensive and decreased the amount of storage space needed for plexiglas cubes
Truck Route Scheduling Trumpf Inc. 2008 Establish the most efficient concept for material delivery and transfer of goods between all buildings
DELMIA Quest Modeling CCAT 2009 Create simulation to determine the optimal sequence of testing equipment and allocation of employees
Improvement of In-Plant Transfer of Gensets DRS 2009 Minimize the use of forklift trucks as much as possible within the production facility
Process Improvement Initiative - 608.1 Test DRS 2009 Improve testing process and eliminate bottlenecks
Adding High Viscosity Raw Materials to Batches Dymax 2009 Reduce frequency of use and size of batches, drums and pails of raw materials in chemical process
Visible Light Flood Lamp Dymax 2009 Design a prototype a low cost version of their 5000 EC flood lamp system
Traffic Yard Logistics Frito Lay 2009 Analyze new trailer organizational possibilities and propose a new traffic yard layout
TANDBERG FieldView Video Collaboration Sikorsky 2009 Create a feasibility analysis for the integration of new technology at Sikorsky for the TANDBERG Field View unit
Automatic Refueling of Military Generators DRS 2010 Design a complete automatic fuel level based on a COTS (Commercial Off The Shelf) automotive type microcontroller
Implementing Temperature Control Systems into Adhesive Mixtures Dymax 2010 Install temperature sensors into two types of mixing systems
Low Cost UV & Visible Flood Lamp Dymax 2010 Develop a low cost UV and visible flood lamp to be used for the high intensity, rapid curing of industrial adhesives
Corn Cook Error Minimization Frito Lay 2010 Propose improvements for the Corn Cook Process, make more efficient alarm process
Optimizing Direct Metal Laser Sintering Pratt & Whitney 2010 Evaluate the advantages versus disadvantages for the Direct Metal Laser Sintering process on aerospace materials
Electrical Component Design Modification Sikorsky 2010 Design an alternative method of strain relief for implementation on the backshell component used for electrical connections